PARTICULARLY MEASUREMENT OF RELIABILITY OF POVER SUPPLY SYSTEM AT A PARTIAL RUNDOWN OF ELECTRICAL EQUIPMENT

Published in Modern Technologies and Scientific and Technological Progress · Issue 1, 2019 · Pages 220–221 · Rubric: ELECTROENERGETICS
DOI: https://doi.org/10.36629/2686-9896/2019-1-1-220-221
Received: 05.04.2019 Accepted: 14.04.2019 Published: 14.04.2019 Language of publication: ru-RU
PARTICULARLY MEASUREMENT OF RELIABILITY OF POVER SUPPLY SYSTEM AT A PARTIAL RUNDOWN OF ELECTRICAL EQUIPMENT
dependability, power system, electrical equipment, simulation.